Can I install 3-phase control relay (RM22T*/RM35T*/RM17T*) to monitor Variable Speed Drive Load (VSD)?
NO, it is not recommended to connect 3-phase control relay (RM22T*/RM35T*/RM17T*) to monitor Variable Speed Drive Load (VSD).
Article available in these languages:
Discuss this topic with experts
Product Resources