Effective turbine controls for cogeneration facilities
This paper focuses not on turbine replacement, but on the upgrade/ replacement of the integrated governor and excitation system controls. In many instances, a control system upgrade will extend the life of existing turbines, avoiding costly refurbishment
Referencia
Tipo
Idiomas
Fecha
Versión
Archivos
ID#267_998-19681874_GMA-US (.pdf) | 1,9 mb |