How can we help you today?
Should we use fuses for the control power of meter.
You should include fuses at the control power terminals.
L1 and L2 are non-polarized. If using an AC power supply with neutral, connect neutral to the meter’s L2 terminal.
Always use a fuse on L1. Fuse L2 when connecting an ungrounded neutral to the control power. If using a control power transformer,
fuse both primary and secondary sides of the transformer. The fuses / circuit breakers must be rated for the installation voltage and sized
for the available fault current.
Kindly find the attachment for the instruction.
L1 and L2 are non-polarized. If using an AC power supply with neutral, connect neutral to the meter’s L2 terminal.
Always use a fuse on L1. Fuse L2 when connecting an ungrounded neutral to the control power. If using a control power transformer,
fuse both primary and secondary sides of the transformer. The fuses / circuit breakers must be rated for the installation voltage and sized
for the available fault current.
Kindly find the attachment for the instruction.
Released for: Schneider Electric India
Attachment(s)
Explore more
Range:
Explore more
Range:
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.