As per AS/NZS 3000:2018, AFDDs shall be located at the switchboard from which the final sub-circuit being protected originates.
Therefore, we strongly recommend having a separate Resi9 AFDD for each final sub-circuit.
Therefore, we strongly recommend having a separate Resi9 AFDD for each final sub-circuit.