The Sepam series 20 and series 40 manuals give the operating time for 2 types of outputs:
- pick-up which is the non-confirmed instantaneous output: e.g. for phase O/C 50/51, T<35ms
- instantaneous which is the output that can be used for tripping: this is the confirmed instantaneous operating time: e.g. for phase overcurrent protection 50/51, T<50ms
Note:
- pick-up time is included in the specified operating time (the 2 times are not added together)
- pick-up time is common to all the non-confirmed outputs of the protection functions in operation, according to the parameter setting of the matrix
Released for: Schneider Electric Singapore


Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.