Goals and Symptoms
How to wire a 2 phase 5 wire system, on an ION 7600 Series meter
Causes and Fixes
 Va1a2= 240V
 Vb1b2=240V
 Va1b1= 170V
 Va1b2=170V
 Va2b1= 170V
 Va2b2=170V
 
 Wiring and Configuration
 
 - Use 2 PTs and 2 CTs
 
 - VOLTS MODE = 4W-Wye
 
 Leave V3 unconnected
 
 
 ________________________________________
 Original article#
 Date Created: July 12, 2010
 Last Revised: July 20, 2010
 Public
 Original Author: SN
 All content Ā© 1992-2010 Schneider Electric
Legacy KB System (APS) Data: RESL202963 V1.0, Originally authored by LaAd on 07/21/2010, Last Edited by LaAd on 07/21/2010
Related ranges: ION7500/ION7600
Released for: Schneider Electric Singapore

