Can the 7x50 meter be upgraded in the field to comply with the EN50160 standard?
Issue:
User would like to enable EN50160 capabilities on an ION7x50 meter
Product Line:
ION7650/7550 Meters
Resolution:
The meter can be upgraded in the field to comply with the EN50160 standard, uploading the PQ template attached to this article onto the meter. The template can be uploaded to the meter using ION Setup. There is a potential issue if the template on the meter is customized, the customized portion will need to be ported over to the new template. For steps on saving frameworks from a meter please refer to this FAQ https://www.se.com/us/en/faqs/FA328711/ .
發佈於: 施耐德電機Taiwan
需要協助?
產品選型工具
快速輕鬆地為您的應用找到合適的產品和附件。
取得報價
立即線上提交您的銷售需求,專業團隊將主動聯繫您。
購買地點
輕鬆在您所在地區找到最近的施耐德電機經銷商。
支援中心
在同一位置找到滿足您所有需求的支援資源。