Should the drive or softstarter be disconnected prior to meggering the motor or motor wires?
Issue:
Drive or softstarter recommendation prior to meggering the motor or motor wires
Product Line:
All variable frequency drives and soft starts
Environment:
All models and serial numbers
Cause:
Meggering the motor
Resolution:
Yes, the drive or soft start must be disconnected before a megger test is performed on the motor or motor wires.
Drive or softstarter recommendation prior to meggering the motor or motor wires
Product Line:
All variable frequency drives and soft starts
Environment:
All models and serial numbers
Cause:
Meggering the motor
Resolution:
Yes, the drive or soft start must be disconnected before a megger test is performed on the motor or motor wires.
發佈於: 施耐德電機Taiwan










需要協助?
產品選型工具
快速輕鬆地為您的應用找到合適的產品和附件。
取得報價
立即線上提交您的銷售需求,專業團隊將主動聯繫您。
購買地點
輕鬆在您所在地區找到最近的施耐德電機經銷商。
支援中心
在同一位置找到滿足您所有需求的支援資源。