How long does it take an ATV630 to accept a run command after receiving line power?
Issue:
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.
發佈於: 施耐德電機Taiwan




需要協助?
產品選型工具
快速輕鬆地為您的應用找到合適的產品和附件。
取得報價
立即線上提交您的銷售需求,專業團隊將主動聯繫您。
購買地點
輕鬆在您所在地區找到最近的施耐德電機經銷商。
支援中心
在同一位置找到滿足您所有需求的支援資源。