我們的品牌

Impact-Company-Logo-English Black-01-177x54

歡迎造訪施耐德電機全球網站

歡迎訪問我們的網站
		
我们今天能为您提供什么帮助?
Why does the PLC Simulator controller HALT when the scan time exceeds 4 times the MAST cycle time of the application?
This is a normal behavior.
When running the simulator, the processor used is the one from the computer, which has many more services to deal with.
Simulator is running on your PC with numerous processes running at the same time.
The watchdog on the simulator is activated only to detect infinite loops.
For instance, in this example an infinite loop was created on purpose , below the mast cycle time and watchdog value leading to CPU HALT in simulation mode :
simulator example HALT

施耐德電機Taiwan

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings