How much space do I need around a GenieEvo switchgear?
GenieEvo should be installed in a clean, dry, well ventilated substation whose climatic conditions are controlled to stay within those specified in IEC 62271-200 clause 2.1.1. GenieEvo has been tested to IEC 62271-200 for internal arc classification AF and requires the following minimum dimensions:
For more information please see Installation, operation and maintenance instructions .
- From back of switchboard to rear wall - 800mm
- From end of switchboard to side wall - 500mm
- From floor to ceiling - 3000mm
For more information please see Installation, operation and maintenance instructions .
Released for: Schneider Electric UK


Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales inquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.