Can the EZM branch devices without a Lever Bypass on the meter socket(s), be field converted to a meter socket(s) with Lever Bypass?
Issue:
Current Product Design

Product Line:
EZM Metering

Environment:
Product Features

Cause:
Application

Resolution:
NO, the EZM branch devices that do not contain lever bypass on the meter socket(s), CANNOT be field converted to meter sockets with Lever Bypass. The EZM branch devices with the lever bypass will need to be obtained from the factory.