How can we help you today?
Can the 5th jaw be removed from standard Five jaw meter sockets for CSED, MP or EZM metering devices?
Issue:
Product features
Product Line:
CSED, MP and EZM Metering products
Environment:
Removal of 5th Jaw
Cause:
Application
Resolution:
Typically the presence of the 5th Jaw in most meter sockets, does not interfere with the function of a single phase watt hour meter. At the request of the Local Utility, the 5th Jaw can be removed to provide a 4 Jaw Meter Socket where needed.
NOTE: In the situation where the 5th jaw is removed, the white insulated 5th Jaw control wire must also be removed from the device.
Product features
Product Line:
CSED, MP and EZM Metering products
Environment:
Removal of 5th Jaw
Cause:
Application
Resolution:
Typically the presence of the 5th Jaw in most meter sockets, does not interfere with the function of a single phase watt hour meter. At the request of the Local Utility, the 5th Jaw can be removed to provide a 4 Jaw Meter Socket where needed.
NOTE: In the situation where the 5th jaw is removed, the white insulated 5th Jaw control wire must also be removed from the device.
Released for: Schneider Electric USA
Explore more
Range:
Explore more
Range:
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales inquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Center
Find support resources for all your needs, in one place.