{}

Our Brands

Impact-Company-Logo-English Black-01-177x54

Schneider Electric USA Website

Welcome to our website.
How can we help you today?
Video: How to install LV426974, 3p, Everlink with control wire terminal lug kit onto PowerPacT B frame
Issue:
How do you install the three pole Everlink with control wire terminal lug kit (LV426974) on a PowerPacT B frame circuit breaker?

Product Line:
Molded Case Circuit Breakers

Resolution:
Remove the green connection system cover (put a screwdriver or similar flat tool into slot in the connecter and push out) and the currently installed lug kit (put a screwdriver or similar flat tool into the gap between the lug kit and breaker on the back, and push the lug kit out). Then install the kit by sliding the notches on the kit into the grooves on the back of the breaker and pressing down on the lug kit until it clicks into place. Then place the labels provided with the kit over the side and front faces of the breaker over the previous lug information. Then reinstall the green connection system cover back onto the breaker. For more information, see video below or the attached instruction bulletin:

Schneider Electric USA

Attachment(s)
B Frame Mechanical Lugs, Everlink Lugs, and Terminal Nut Connectors.pdf [4.87 MB]
Explore more
Range:
Articles that might be helpful Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Range: