No, there are no factory commands to power cycle an ION 7700 using telnet or hyperterminal. The meter can only be powered down (or power cycled) locally at the meter.
Publikováno pro:Schneider Electric Česká republika


{}
No, there are no factory commands to power cycle an ION 7700 using telnet or hyperterminal. The meter can only be powered down (or power cycled) locally at the meter.