This article shows how to verify the meter operation while connected to a circuit.
(1) Use the phasor diagram to verify the meters wiring as described in the meter's installation guide.
(2) Confirm nonzero readings for voltage and current readings according to the electrical service type.
(3) Verify the meter's event log for unusual events (201/246 DSP reset ION events).
(4) Verify the sag/swell count, if there is an abnormal count, the events should be investigated.
When the meter is connected to MV-90, the events and revenue log information can be read as described in the MV-90 and ION Technology technical note.
For further information please contact your local Technical Support Center.
Publikováno pro: Schneider Electric Česká republika
Potřebujete pomoc?
Nástroj pro výběr produktů
Rychle a snadno vyhledávejte správné produkty a příslušenství pro vaše aplikace.
Získejte nabídku
Poptejte nás online a náš lokální specialista se s vámi spojí!
Kde nakoupit?
Jednoduše najděte nejbližšího distributora výrobků Schneider Electric ve vašem okolí.
Centrum nápovědy
Zdroje podpory pro všechny své potřeby najdete na jednom místě.