Video: How to generate and configure a PUE (Power Usage Effectiveness) report in Power Monitoring Expert
Issue
How to generate and configure a PUE (Power Usage Effectiveness) report?
Product Line
Power Monitoring Expert 7.2.x
Power Monitoring Expert 8.x
Power Monitoring Expert 9.0
Power Monitoring Expert 2020
Power Monitoring Expert 2021
Power Monitoring Expert 2022
Power Monitoring Expert 2023
Power Monitoring Expert 2024
Environment
Generating PUE report from Web Application
Cause
User would like to know how to generate PUE report and learn how the report calculates PUE.
Resolution
A video is attached which describes a step-by-step procedure on how to generate and configure PUE reports.
Note: As of PME 9.0 the Reports tab layout looks different. However, the actual report parameters are unchanged.
PUE calculation:
PUE (Power Usage Effectiveness): The ratio between the data center and IT equipment energy measurement values.
This value is calculated for each of the required time periods by the following formula:
PUE = Sum of DataCenter Energy / Sum of IT Equipment Energy
IT Equipment – The average of the IT equipment power measurement values for each of the
time periods.
Data Center - The average of the data center power measurement values for each of the time
periods.
Publikováno pro: Schneider Electric Česká republika
Zjistěte více
Řada:
Zjistěte více
Řada:
Potřebujete pomoc?
Nástroj pro výběr produktů
Rychle a snadno vyhledávejte správné produkty a příslušenství pro vaše aplikace.
Získejte nabídku
Poptejte se nás online a náš lokální specialista se s vámi spojí!
Kde nakoupit?
Jednoduše najděte nejbližšího distributora výrobků Schneider Electric ve vašem okolí.
Centrum nápovědy
Zdroje podpory pro všechny své potřeby najdete na jednom místě.