Jak vám dnes můžeme pomoci?

Power Monitoring Expert 8.2 - the SEMI F47 curve as available in the PQ Report is incorrect - attached SQL script will correct it

Issue
The PME 8.2 Power Quality offers the option to use the SEMI F47 curve. If this is used, you will notice that the curve is incorrect.
The SEMI F47 standard allows a 50% voltage sag for up to 0.2 seconds. The curve incorrectly uses 0.02 seconds, rather than 0.2 seconds as the tolerance for a 50% sag.

Product Line
Power Monitoring Expert 8.2

Environment
Using the PQ Report with the SEMI F47 curve.

Cause
The definition of the SEMI F47 in PME 8.2 is incorrect.

Resolution

*Warning: Irreparable database damage can occur. This procedure should only be performed by users familiar with SQL Server Management Studio. Databases should be backed up prior to performing this procedure.*​

Log into SQL Server Management Studio and run the attached SQL script (PME8.2_SEMIF47_CurveUpdate.sql)  to correct the curve definition. See attached document

This problem has been addressed in PME 9.0

Schneider Electric Česká republika

Přílohy

Zjistěte více

Zjistěte více

Potřebujete pomoc?

Nástroj pro výběr produktů

Rychle a snadno vyhledávejte správné produkty a příslušenství pro vaše aplikace.

Získejte nabídku

Poptejte se nás online a náš lokální specialista se s vámi spojí!

Kde nakoupit?

Jednoduše najděte nejbližšího distributora výrobků Schneider Electric ve vašem okolí.

Centrum nápovědy

Zdroje podpory pro všechny své potřeby najdete na jednom místě.