Jak vám dnes můžeme pomoci?

Is an PDM power supply required after an STBCPS2111 in an Advantys Island?

Issue
The Advantys Configuration Software (ACS) documentation states, "NOTE: a PDM is required after a CPS module", although the ACS software does not error or prompt a warning when a PDM is not included in the configuration.


Product Line
Advantys STB
STBCPS2111
STBPDTx0x1


Environment
Advantys Configuration Software (V11 and lower)


Resolution
A Power Distribution Module (PDM) is not always required after an STBCPS2111.
The documentation incorrectly states that a PDM is required.

The PDM distributes either AC or DC field power to a cluster of I/O modules directly to its right on the Island bus.  A PDM delivers field power to the input modules and the output modules.  It is important that all the I/O installed directly to the right of a PDM be in the same voltage group—either 24 VDC, 115 VAC, or 230 VAC.

Schneider Electric Česká republika

Zjistěte více

Zjistěte více

Potřebujete pomoc?

Nástroj pro výběr produktů

Rychle a snadno vyhledávejte správné produkty a příslušenství pro vaše aplikace.

Získejte nabídku

Poptejte se nás online a náš lokální specialista se s vámi spojí!

Kde nakoupit?

Jednoduše najděte nejbližšího distributora výrobků Schneider Electric ve vašem okolí.

Centrum nápovědy

Zdroje podpory pro všechny své potřeby najdete na jednom místě.