{}

Naše značky

Impact-Company-Logo-English Black-01-177x54

Vítejte na internetových stránkách společnosti Schneider Electric

Vítejte na našich internetových stránkách.
Prohledejte časté dotazy
Runtime Calibration Refused due to UPS in invalid State

Issue:
My NMC show Runtime Calibration Refused due to UPS in invalid State when attempting to run a Calbration test on my SRTG UPS

Product Line:
Smart-UPS SRTG

Environment:
All models, All Serial Numbers

Cause:
The SRTG range of UPS do not have a runtime calibration test like the SRT range do,  the NMC firmware is shared by the SRT and SRTG UPS which is why the option is showing.

A manual calibration test must be performed by removing AC power from the UPS and letting the battery power the UPS until it is discharged, and then AC power introduced again to charge the batteries.

Schneider Electric Česká republika

Zjistěte více
Produkt:
Užitečné články
Zjistěte více
Produkt: