Generally, large industrial site designs use standard specifications of the HV/MV transformer which leads to oversizing and a higher cost of the MV primary and secondary electrical distribution system. This paper introduces the factors to consider when sp
Datoteke
Ime datoteke | ||
VAVR-AFGLE8_R0_EN.pdf
|
|