Hur kan vi hjälpa dig idag?

Do the auxiliary CTs monitoring the mains on a Branch Circuit Power Meter (BCPM) need shorting blocks?

Product Line
Branch Circuit Power Monitor (BCPM)

Environment
BCPM Wiring and Installation

Resolution
*Warning:  Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death.

The auxiliary CTs on a BCPM do not require a CT shorting block.
The auxiliary CTs have VOLTAGE secondaries. They must NOT be shorted.

Schneider Electric Sverige

Utforska mer

Behöver du hjälp?

Produktväljare

Hitta snabbt och enkelt rätt produkter och tillbehör för dina ändamål.

Begär en offert

Ställ din fråga online så kontaktar vi dig.

Här köper du

Hitta enkelt närmaste Schneider Electric-distributör på din ort.

Hjälpcenter

Hitta alla supportresurser som du behöver på ett ställe.