Hur kan vi hjälpa dig idag?
Verifying meter's operation (ION 86xx)
This article shows how to verify the meter operation while connected to a circuit.
(1) Use the phasor diagram to verify the meters wiring as described in the meter's installation guide.
(2) Confirm nonzero readings for voltage and current readings according to the electrical service type.
(3) Verify the meter's event log for unusual events (201/246 DSP reset ION events).
(4) Verify the sag/swell count, if there is an abnormal count, the events should be investigated.
When the meter is connected to MV-90, the events and revenue log information can be read as described in the MV-90 and ION Technology technical note.
For further information please contact your local Technical Support Center.
Publicerad för: Schneider Electric Sverige
Behöver du hjälp?
Produktväljare
Hitta snabbt och enkelt rätt produkter och tillbehör för dina ändamål.
Begär en offert
Ställ din fråga online så kontaktar vi dig.
Här köper du
Hitta enkelt närmaste Schneider Electric-distributör på din ort.
Hjälpcenter
Hitta alla supportresurser som du behöver på ett ställe.