Hur kan vi hjälpa dig idag?

EM4900 Installation: Using Voltage/Potential Transformers

Issue
User may need to use PTs when installing the EM4900 series meters and may not know that they do NOT have the option to program PT ratios in their configurations.

Product Line
EM4900

Environment
Installation

Cause
BCPM and EM4900 series meters do not have the option to program PT ratios in their configurations.

Resolution
The user may use PTs to step down the input control power and measurement voltages as required, but will need to compensate for the ratios when reading the meter's outputs, in the case of the measurement voltages.
For example, if a PT of ratio 480:120 is used, one will need to multiply all the output values, with the exception of the current, by a factor of 4.

Kindly refer to the link below for the EM4900 series documentation:

FA324770

Schneider Electric Sverige

Utforska mer
Produktfamilj
Kategori:
Utforska mer
Produktfamilj
Kategori:

Behöver du hjälp?

Behöver du hjälp?

Produktväljare

Produktväljare

Hitta snabbt och enkelt rätt produkter och tillbehör för dina ändamål.

Begär en offert

Begär en offert

Ställ din fråga online så kontaktar vi dig.

Här köper du

Här köper du

Hitta enkelt närmaste Schneider Electric-distributör på din ort.

Hjälpcenter

Hjälpcenter

Hitta alla supportresurser som du behöver på ett ställe.

  • Produktdokumentation
  • Ladda ner programvara
  • Produktväljare
  • Byt ut eller ersätt produkt
  • Hjälp- och kontaktcenter
  • Här köper du
  • Begär en offert
  • Hitta våra kontor
  • Shop.se.com/se/sv nedstängning
  • Schneider Electrics community
  • Karriär
  • Företagsprofil
  • Rapportera ett tjänstefel
  • Tillgänglighet
  • Pressrum
  • Investerare
  • EcoStruxure
  • Sök jobb
  • Blogg
  • Sekretesspolicy
  • Cookie-information
  • Användarvillkor
  • Change your cookie settings