How to configure C/K for Varlogic in parallel operation of 2 CTs + summing transformer?
If both CTs are the same, e.g. 200A/5A, and summing CT gives rated 5A output with ration 5A+5A/5A, then if 200A flow in each rung (means 400A is total current), then both CTs gives 5A secondary and summing transformer with ratio 5A+5A/5A gives 5A output.  o CT ratio as Varlogic sees is 400A/5A

For better explanation see attached file. There is also example with c/K calculation. It is in French only , but easy to understand it. Case with 2CTs in parallel + summing CT is specifically in section 4.1, pages 9-10.

Schneider Electric Sverige

Bilagor
Guide for parallel operation.pdf [391.3 KB]
Utforska mer
Produktfamilj
Utforska mer
Produktfamilj

Behöver du hjälp?

  • Produktväljare

    Hitta snabbt och enkelt rätt produkter och tillbehör för dina ändamål.

  • Begär en offert

    Ställ din fråga online så kontaktar vi dig.

  • Här köper du

    Hitta enkelt närmaste Schneider Electric-distributör på din ort.

  • Hjälpcenter

    Hitta alla supportresurser som du behöver på ett ställe.

  • Produktdokumentation
  • Ladda ner programvara
  • Produktväljare
  • Byt ut eller ersätt produkt
  • Hjälp- och kontaktcenter
  • Här köper du
  • Begär en offert
  • Hitta våra kontor
  • Shop.se.com/se/sv nedstängning
  • Schneider Electrics community
  • Karriär
  • Företagsprofil
  • Rapportera ett tjänstefel
  • Tillgänglighet
  • Pressrum
  • Investerare
  • EcoStruxure
  • Sök jobb
  • Blogg
  • Sekretesspolicy
  • Cookie-information
  • Användarvillkor
  • Change your cookie settings