Hur kan vi hjälpa dig idag?

Can IO Scanner be modified in an M580 Hot Standby system without interruption?

Issue

Looking to add, remove or modify devices from the NOC or CPU DTM. Can this be done without process interruption?

Resolution

Yes, this can be done. As of Unity V12, all Control Expert and v2.8 of M580, the ability to apply an offline application modification and return to a Standby state was introduced.  This is accomplished using the HSBY_BUILD_OFFLINE block. It supports modifications that require an offline BUILD CHANGE. It will not support ReBuild All modifications, only Build Change.

Attached is a document which outlines this feature.

Schneider Electric Sverige

Bilagor
M580 HSBY Adding a Device while Process Running v2.0.pptx.zip [997.18 KB]
Utforska mer
Produktfamilj
Utforska mer
Produktfamilj

Behöver du hjälp?

Behöver du hjälp?

Produktväljare

Produktväljare

Hitta snabbt och enkelt rätt produkter och tillbehör för dina ändamål.

Begär en offert

Begär en offert

Ställ din fråga online så kontaktar vi dig.

Här köper du

Här köper du

Hitta enkelt närmaste Schneider Electric-distributör på din ort.

Hjälpcenter

Hjälpcenter

Hitta alla supportresurser som du behöver på ett ställe.

  • Produktdokumentation
  • Ladda ner programvara
  • Produktväljare
  • Byt ut eller ersätt produkt
  • Hjälp- och kontaktcenter
  • Här köper du
  • Begär en offert
  • Hitta våra kontor
  • Shop.se.com/se/sv nedstängning
  • Schneider Electrics community
  • Karriär
  • Företagsprofil
  • Rapportera ett tjänstefel
  • Tillgänglighet
  • Pressrum
  • Investerare
  • EcoStruxure
  • Sök jobb
  • Blogg
  • Sekretesspolicy
  • Cookie-information
  • Användarvillkor
  • Change your cookie settings