Ako vám dnes môžeme pomôcť?
How to configure the SER2408/3200 device to work with the Generator Performance module in PME.
Issue
When attempting to assign I/O in the generator performance module, one is unable to locate all input assignments.
Product Line
Power Monitoring Expert 8.x
Power Monitoring Expert 9.x
Power Monitoring Expert 2020
Power Monitoring Expert 2021
Power Monitoring Expert 2022
Power Monitoring Expert 2023
Power Monitoring Expert 2024
Environment
Generator Performance Module
Cause
Before the device can be properly configured in the Generator Performance Configuration Tool it must first be configured and added into PME properly.
After device data is logged into the database, you can assign device measurements using the Generator Performance Configuration Tool with EPSS Test Module.
Resolution
Please refer to page 55 of the Generator Performance Configuraiton guide for instructions on configuring the SER hardware.
Publikované pre: Schneider Electric Slovakia
Príloha(-y)
Potrebujete pomoc?
Výber produktov
Rýchlo a jednoducho nájdite tie správne produkty a príslušenstvo pre vaše aplikácie.
Získať ponuku
Kontaktujte nás online a náš odborník sa s vami spojí.
Kde nakúpiť?
Jednoducho nájdite najbližšieho distribútora produktov Schneider Electric vo vašom okolí.
Centrum podpory
Nájdite zdroje podpory pre všetky vaše potreby na jednom mieste.