我们今天能为您提供什么帮助?

ION 7650/7550 or ION 8650 meter displays error V NegSeqMag Voltage Unbalance Count N1 limit exceeded

Issue
User observes a number of error messages from the meter related to V NegSeqMag with Voltage Unbalance Count N1 limit exceeded

Product
ION 7650

ION 8650

Environment
Power Monitoring Expert (PME)

StruxureWare Power Monitoring (SPM)

ION Setup

Cause
The events are coming from the Signal Limit Evaluation Module. Every 10 minutes the module will evaluate the Source and Nominal inputs and increment the Valid or Invalid outputs. Only the Invalid outputs are incrementing which is triggering the events. The root cause is the Phase rotation setting in the meter does not match the physical system.

Resolution
Change the phase order setup register

In ION Setup
1) Connect to the meter
2) Place the meter in Advanced configuration mode (refer to ION Setup help for more information if required)
3) Select the power meter modules folder
4) Double click on the Power Meter Module
5) Under setup registers, change the setup register PhaseOrder to match the system. Options are either ABC or ACB.
6) Send changes to the meter
7) Close ION Setup

In Designer
1) Open the meter node in Designer
2) Navigate to the Power Meter Module
3) Right click on the module to enter setup window
4) Under the setup registers modify the PhaseOrder register to match the system
5) Close the meter node inside designer then close designer

施耐德電機Taiwan

探索更多
系列:
探索更多
系列:

需要協助?

需要協助?

產品選型工具

產品選型工具

快速輕鬆地為您的應用找到合適的產品和附件。

取得報價

取得報價

立即線上提交您的銷售需求,專業團隊將主動聯繫您。

購買地點

購買地點

輕鬆在您所在地區找到最近的施耐德電機經銷商。

支援中心

支援中心

在同一位置找到滿足您所有需求的支援資源。

  • 產品文檔
  • 軟體下載
  • 產品選型工具
  • 產品替代和替換
  • 幫助和聯絡中心
  • 尋找我們的辦公室
  • 取得報價
  • 施耐德電機社群
  • 人才招募
  • 公司簡介
  • 舉報不當行為
  • 無障礙
  • 新聞中心
  • 投資者
  • 專業洞察
  • 台灣施耐德電機學院
  • 綠色影響力落差調查
  • Schneider Go Green 2025
  • 隱私政策
  • Cookie通告
  • 使用條款
  • Change your cookie settings