Issue:
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.
Опубліковано для: Schneider Electric Україна




Потрібна допомога?
Інструмент вибору продукту
Швидко та легко знаходьте потрібні продукти й допоміжне обладнання для своїх завдань.
Розрахувати вартість
Ставте свої запитання щодо продажів онлайн, і з вами зв’яжеться фахівець
Де придбати?
Зручний пошук найближчого дистриб’ютора, магазина або спеціалізованого партнера Schneider Electric у вашому регіоні.
Довідковий центр
Знайдіть усі необхідні ресурси для підтримки в одному місці.