Issue:
Dielectric testing a Masterpact MTZ with Micrologic X control unit prerequisites
Product Line:
Circuit Breakers
Environment:
Masterpact MTZ with Micrologic X Control Unit
Resolution:
If equipped, disconnect the VPS module by pulling it out to the disconnected position before running a dielectric test on the equipment. The VPS module is installed in the lower part of the Micrologic X control unit. The VPS does not need to be fully removed, just pull it out to the disconnected position. This is an intermediate position where no power is connected (AC inputs and 24 DC output). In this position, the VPS is completely isolated. This position allows you to perform the switchboard dielectric tests without risks.
Dielectric testing a Masterpact MTZ with Micrologic X control unit prerequisites
Product Line:
Circuit Breakers
Environment:
Masterpact MTZ with Micrologic X Control Unit
Resolution:
If equipped, disconnect the VPS module by pulling it out to the disconnected position before running a dielectric test on the equipment. The VPS module is installed in the lower part of the Micrologic X control unit. The VPS does not need to be fully removed, just pull it out to the disconnected position. This is an intermediate position where no power is connected (AC inputs and 24 DC output). In this position, the VPS is completely isolated. This position allows you to perform the switchboard dielectric tests without risks.
Опубліковано для: Schneider Electric Україна


Потрібна допомога?
Інструмент вибору продукту
Швидко та легко знаходьте потрібні продукти й допоміжне обладнання для своїх завдань.
Розрахувати вартість
Ставте свої запитання щодо продажів онлайн, і з вами зв’яжеться фахівець
Де придбати?
Зручний пошук найближчого дистриб’ютора, магазина або спеціалізованого партнера Schneider Electric у вашому регіоні.
Довідковий центр
Знайдіть усі необхідні ресурси для підтримки в одному місці.