How to install/remove NSX mccb from powerpact 4 panel and the torque settings required.
When installing a PowerPact 4 MCCB onto the panel, the shear off bolts will shear when the correct torque setting has been reached - 20Nm for 100/160/250 frames and 28Nm for 400/630.
Refer to the instructions below, which are from the attached file.
A 17mm bi hex socket tool is required for removing the MCCB after the shear off bolts have been removed during first installation.
Released for: Schneider Electric UK


Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales inquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.