When is isolated power required?
Issue:
Isolated Power, when is it needed?
Product Line:
Hospital Isolated Power Systems
Environment:
NFPA99, NEC517.160
Cause:
Codes and Standards
Resolution:
In wet procedure locations in hospitals, special protection against electrical shock is required, and this is attainable by using Class A GFCI or an isolated power system. For electrical safety, the NEC recommends isolated power systems, which should be installed whenever a power outage cannot be tolerated during a ground fault condition.
Isolated Power, when is it needed?
Product Line:
Hospital Isolated Power Systems
Environment:
NFPA99, NEC517.160
Cause:
Codes and Standards
Resolution:
In wet procedure locations in hospitals, special protection against electrical shock is required, and this is attainable by using Class A GFCI or an isolated power system. For electrical safety, the NEC recommends isolated power systems, which should be installed whenever a power outage cannot be tolerated during a ground fault condition.
Released for: Schneider Electric USA
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales inquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Center
Find support resources for all your needs, in one place.