{}

Our Brands

Impact-Company-Logo-English Black-01-177x54

Schneider Electric USA Website

Welcome to our website.
How can we help you today?
What factory testing is done for Powerpact H, J, and L frame breakers?
Issue:
Production test report H J L breakers

Product Line:
Circuit Breakers

Environment:
Powerpact H, J, L frames

Resolution:
During manufacture and prior to shipping, Powerpact H, J, and L frame breakers receive the following:
  1. Visual inspection of all lugs and operating mechanisms.
  2. Secondary injection testing of all trip units.  Units must trip inside the time-current published trip curve tables.
  3. Calibration of metering features in electronic trip unit to within 2%.
Note:
A report may be ordered at the time the breaker is ordered.
A test report is not on file and is not available if not ordered with the breaker.
See attached for a sample report.

Schneider Electric USA

Attachment(s)
Powerpact H J L Test Report.pdf [161.32 KB]
Explore more
Range:
Articles that might be helpful Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Range: