1 - G2GF with in-built GSM / GPRS modem
The following procedure of EPROM replacement is applicable only for G2GF with GPRS modem.1.1 - Power off the device
Open the enclosure | |
Disconnect the supply (Unplug the connector at bottom right edge) | |
1.2 - Removal card
Remove two screws of GPRS modem. | |
Gently pull out the GPRS modem card | |
1.3 - EPROM replacement
EPROM to be replaced. | |
Remember the EPROM position according to the notch. It must be respected. | |
Use screwdriver or IC extractor to remove the EPROM from the board. In case of screwdriver apply it on both the side equally and slowly remove the EPROM | |
Insert the new Eprom. Warning: the direction must be respected. There is a notch, to be placed upward. This step is the most sensitive: the pins of the EPROM must be correctly inserted. Do not bend them. | |
All pin must aligned and kept in position before pressing the EPROM in socket | |
1.4 - Testing of Product
Reinstall the GPRS modem and screw it properly. | |
Connect the power supply | |
Connect the computer to G200 and check the G200 functioning with the help of Easergy Configurator. | |
Place the cover (enclosure) back and tighten screws properly. |
2 - G2SF without any modem.
2.1 - Power off the device
Open the enclosure | |
Disconnect the supply (Unplug the connector at bottom right edge) | |
2.2 - Removal card
Remove two screws of a card as mentioned. | |
This is the EPROM, which needs to be replaced. | |
2.3 - EPROM replacement
Refer Chapter 1.3 - EPROM Replacement on page - 4.2.4 - Testing of Product
Reinstall the daughter card removed previously. | |
Connect the power supply | |
Connect the computer to G200 and check the G200 functioning with the help of Easergy Configurator. | |
Place the cover (enclosure) back and place the joints correctly. |
3 - G2PF AC version
3.1 - Power off the device
Open the enclosure | |
Turn off and disconnect the AC supply Check and confirm that device is completely off. | |
3.2 - Removal card
Disconnect DC supply connector of G200 main board. | |
Remove two screws of a card as mentioned. | |
This is the EPROM, which needs to be replaced. | |
3.3 - EPROM replacement
Refer Chapter 1.3 - EPROM Replacement on page - 4.3.4 - Testing of Product
Reinstall the daughter card removed previously. | |
Connect the DC supply of G200 main board. | |
Turn on the AC supply of board. | |
Connect the computer to G200 and check the G200 functioning with the help of Easergy Configurator. | |
Place the cover (enclosure) back close the G200 door correctly. | |
4 - G2PF DC version
4.1 - Power off the device
Open the enclosure | |
Turn off and disconnect the DC supply, both solar and battery. Check and confirm that device is completely off. | |
4.2 - Removal card
Disconnect DC supply connector of G200 main board. | |
Remove two screws of a card as mentioned. | |
This is the EPROM, which needs to be replaced. | |
4.3 - EPROM replacement
Refer Chapter 1.3 - EPROM Replacement on page - 4.4.4 - Testing of Product
Reinstall the daughter card removed previously. | |
Connect the DC supply of G200 main board. | |
Turn on the DC supply of G200 both sources, Solar and battery. | |
Connect the computer to G200 and check the G200 functioning with the help of Easergy Configurator. | |
Place the cover (enclosure) back close the G200 door correctly. | |
Đã phát hành cho: Schneider Electric Việt Nam
Bạn cần trợ giúp?
Bắt đầu ở đây!
Tìm câu trả lời ngay. Tự tìm kiếm giải pháp, hoặc kết nối với một trong các chuyên gia của chúng tôi.
Liên hệ hỗ trợ
Liên hệ với nhóm chăm sóc khách hàng của Schneider để nhận thêm thông tin, được hỗ trợ kỹ thuật, trợ giúp khiếu nại và các thông tin khác.
Nơi mua hàng?
Dễ dàng tìm nhà phân phối Schneider Electric gần bạn nhất.
Tìm kiếm câu hỏi thường gặp
Nhận câu trả lời bạn cần bằng cách duyệt tìm những Câu hỏi thường gặp (FAQ) liên quan đến chủ đề.
Liên hệ bộ phận bán hàng
Đăng ký bán hàng trực tuyến và chuyên gia của chúng tôi sẽ liên hệ với bạn.