I can't control the execution time of my M580 hot standby user application, and would have liked to set MAST in cyclic mode. How can I do
Set the MAST period to a value that is slightly higher than the typical execution time.
If your application exceeds this value, an "overrun" condition is detected. This condition is not a problem; the system is designed to manage it and will not be jeopardized (Primary / Standby), as long as the program is not permanently in overrun.
Check that there is a margin between the maximum actual execution time and the MAST watchdog value. If not, the watchdog may spuriously be triggered
Make sure the program is not permanently in overrun. If it is, certain operations will be difficult or impossible to execute:
- transfert project from Primary to standby PLC
- application backup
- Read/Write SD card
- Reconfiguration of a module on local rack, after a hot-swap
Đã phát hành cho: Schneider Electric Việt Nam


Bạn cần trợ giúp?
Công cụ chọn sản phẩm
Nhanh chóng và dễ dàng tìm được sản phẩm và phụ kiện phù hợp cho các ứng dụng của bạn.
Nhận báo giá
Bắt đầu gửi yêu cầu bán hàng trực tuyến và chuyên gia sẽ liên hệ với bạn.
Nơi mua hàng?
Dễ dàng tìm nhà phân phối Schneider Electric gần bạn nhất.
Trung tâm Hỗ trợ
Tìm sự hỗ trợ cho mọi nhu cầu của bạn tại một nơi.