Issue:
IEC code in the PLC not available for upload.

Product Line:
Concept programming software.
Cause:
Either the project was downloaded before Concept 2.5 SR2 which is when IEC upload was added or
The IEC upload switch was not engaged when the project was originally downloaded.
Resolution:
There is no workaround for this problem.
The customer can avoid it in the future by opening the project offline and going to <Project><Code generation options...> and
checking <Include IEC upload information>. This should be followed by a full download to the PLC.
IEC code in the PLC not available for upload.
Product Line:
Concept programming software.
Cause:
Either the project was downloaded before Concept 2.5 SR2 which is when IEC upload was added or
The IEC upload switch was not engaged when the project was originally downloaded.
Resolution:
There is no workaround for this problem.
The customer can avoid it in the future by opening the project offline and going to <Project><Code generation options...> and
checking <Include IEC upload information>. This should be followed by a full download to the PLC.
Đã phát hành cho: Schneider Electric Việt Nam


Bạn cần trợ giúp?
Công cụ chọn sản phẩm
Nhanh chóng và dễ dàng tìm được sản phẩm và phụ kiện phù hợp cho các ứng dụng của bạn.
Nhận báo giá
Bắt đầu gửi yêu cầu bán hàng trực tuyến và chuyên gia sẽ liên hệ với bạn.
Nơi mua hàng?
Dễ dàng tìm nhà phân phối Schneider Electric gần bạn nhất.
Trung tâm Hỗ trợ
Tìm sự hỗ trợ cho mọi nhu cầu của bạn tại một nơi.