Hôm nay chúng tôi có thể giúp gì cho bạn?

How to reset the SmartConnect Communications/Network Interface

Issue:
How to reset the SmartConnect Communications/Network Interface

Product Line:
SmartConnect enables Smart-UPS

Environment:
Smart-UPS SMC, SMT, SMTL, SMX, SCL, SRTL with built-in SmartConnect network port

Cause:
Need to reset for X reason, or need to establish or re-establish connectivity with the SmartConnect cloud communications with PowerChute.

NOTE: Resetting the communications interface won't affect the load attached. AC output will continue.

Solution:
To reset the communications/network of an SMT, SMTL, SMX, or SRTL model UPS on the display interface, hold the UP and DOWN buttons simultaneously for 10 seconds. The display flashes to indicate that the network interface has restarted.

SMT1500C Front Panel

NOTE: For SMT1500RM1UC models, to reboot the network interface, reset the UPS. See FAQ FA156611

To reset the communications/network interface of an SMC model UPS, hold the MUTE and MENU buttons simultaneously for 10 seconds on the display interface. The display flashes to indicate that the network interface has restarted.
SMC1500C
SMC1500C

To reset the communications/network interface of an SCL model UPS, insert a paperclip into the reset hole on the rear of the UPS.
SmartConnect network port image

Schneider Electric Việt Nam

Tìm hiểu thêm
Phạm vi:
Tìm hiểu thêm
Phạm vi:
  • Tài liệu về Sản phẩm
  • Tải xuống phần mềm
  • Công cụ chọn Sản phẩm
  • Thay thế và thay đổi sản phẩm
  • Trung tâm Hỗ trợ
  • Tìm Văn phòng của chúng tôi
  • Nhận báo giá
  • Tìm Nhà Phân phối
  • Cộng đồng Schneider Electric
  • Cơ hội nghề nghiệp
  • Hồ sơ doanh nghiệp
  • Báo cáo hành vi sai trái
  • Khả năng truy cập
  • Phòng tin tức
  • Nhà đầu tư
  • EcoStruxure
  • Tìm việc
  • Blog
  • Chính sách bảo mật
  • Thông báo về Cookie
  • Điều khoản sử dụng
  • Change your cookie settings