Issue
There may not be room in the switchgear for another set of CT's so it is possible to use an existing set CT's. An example would be if there is a set of CT's for a power meter already installed in the gear.
Product Line
AccuSine PCS+
Resolution
Attached is an example wiring diagram showing how the existing metering CT's can be wired to the AccuSine from the power meter. These CT's need to be wired in series to the AccuSine from the power meter. It will not work correctly if wired in parallel.
There may not be room in the switchgear for another set of CT's so it is possible to use an existing set CT's. An example would be if there is a set of CT's for a power meter already installed in the gear.
Product Line
AccuSine PCS+
Resolution
Attached is an example wiring diagram showing how the existing metering CT's can be wired to the AccuSine from the power meter. These CT's need to be wired in series to the AccuSine from the power meter. It will not work correctly if wired in parallel.
Đã phát hành cho: Schneider Electric Việt Nam
Bạn cần trợ giúp?
Công cụ chọn sản phẩm
Nhanh chóng và dễ dàng tìm được sản phẩm và phụ kiện phù hợp cho các ứng dụng của bạn.
Nhận báo giá
Bắt đầu gửi yêu cầu bán hàng trực tuyến và chuyên gia sẽ liên hệ với bạn.
Nơi mua hàng?
Dễ dàng tìm nhà phân phối Schneider Electric gần bạn nhất.
Trung tâm Hỗ trợ
Tìm sự hỗ trợ cho mọi nhu cầu của bạn tại một nơi.