PC/104 Card Stacking for SAGE RTU CPU Upgrades

Issue

Users need guidance on the correct stacking order of PC/104 cards when installing or upgrading the CPU in SAGE RTU units.

Product

SAGE RTU Product Line (models using PC/104 architecture, including C3414 CPU upgrades)

Environment

Utility substations or industrial automation systems where SAGE RTUs require CPU upgrades or additional PC/104 expansion modules.

Cause

Incorrect stacking of PC/104 cards can lead to clearance issues, improper connections, or malfunction of optional modules such as Ethernet or GPS.

Resolution

When stacking PC/104 cards:

  • Place the CPU card on top of the stack for standard installations.
  • If installing the C3463 Ethernet 5-Port Switching Hub, it must be placed on top of the CPU card due to clearance restrictions.
  • Other optional cards (e.g., C3461 GPS, C3830 Analog Input, C3831 IRIG-B, C3437 Communication Expansion) should be stacked below the CPU card in any order, except where noted.
  • Ensure all connectors are properly aligned and secured using the provided mounting hardware.

Refer to next Figure for the recommended stacking layout:

1

Schneider Electric Việt Nam

Tìm hiểu thêm
Phạm vi:
Tìm hiểu thêm
Phạm vi:
  • Tài liệu về Sản phẩm
  • Tải xuống phần mềm
  • Công cụ chọn Sản phẩm
  • Thay thế và thay đổi sản phẩm
  • Trung tâm Hỗ trợ
  • Tìm Văn phòng của chúng tôi
  • Nhận báo giá
  • Tìm Nhà Phân phối
  • Cộng đồng Schneider Electric
  • Cơ hội nghề nghiệp
  • Hồ sơ doanh nghiệp
  • Báo cáo hành vi sai trái
  • Khả năng truy cập
  • Phòng tin tức
  • Nhà đầu tư
  • EcoStruxure
  • Tìm việc
  • Blog
  • Chính sách bảo mật
  • Thông báo về Cookie
  • Điều khoản sử dụng
  • Change your cookie settings