How do I create a new project in EcoSet Config?
To create and design multiple switchboard, and to configure it , you must create a project. When a new project is created, you can develop multiple switchboards and configure each switchboard with required switchgears.
- Click Create a project.
- Enter your project name and update the basic information.
- Select the latest price list from the Applied price list drop down menu.
- Click Create.
Your new project is now created, and you can proceed to create a new switchboard.
The following tabs will appear in sequence.
| Tabname | Function |
| MANAGESWITCHBOARD(A) | To manage multiple switchboards for a project. |
| SELECTAPRODUCT(B) | To create and manage switchboards. |
| SINGLE LINE DIAGRAM (C) | To generate and view the single line diagram. |
| DESIGN A SWITCHBOARD (D) | To select and manage switchboards. |
| BILLOFMATERIAL(E) | To generate bill of material for the final products. |
| EXPORT(F) | To export all project related documents in different document format like pdf, csv, jpg. |
Manage Switchboards
Đã phát hành cho: Schneider Electric Việt Nam
Bạn cần trợ giúp?
Công cụ chọn sản phẩm
Nhanh chóng và dễ dàng tìm được sản phẩm và phụ kiện phù hợp cho các ứng dụng của bạn.
Nhận báo giá
Bắt đầu gửi yêu cầu bán hàng trực tuyến và chuyên gia sẽ liên hệ với bạn.
Nơi mua hàng?
Dễ dàng tìm nhà phân phối Schneider Electric gần bạn nhất.
Trung tâm Hỗ trợ
Tìm sự hỗ trợ cho mọi nhu cầu của bạn tại một nơi.