Hôm nay chúng tôi có thể giúp gì cho bạn?
How to execute the GET_TS_EVT_M on a M580 redoundant PLC ?
GET_TS_EVT_M function block be executed in a Modicon M580 Redundant system to retrieve timestamped events ?In an M580 Redundant system, the GET_TS_EVT_M function block must be executed only by the Primary CPU, as recommended on page 214 of the EcoStruxure Control Expert System Bloc Library attached:
The application should check the Redundant operating state before executing the function block. The call to GET_TS_EVT_M must be enabled when the local CPU is operating as the Primary CPU and disabled when the local CPU is operating as the Standby CPU.
This prevents both CPUs from executing the timestamped-event retrieval operation at the same time and avoids duplicate or inconsistent event processing.
If a switchover occurs, the former Standby CPU becomes the new Primary CPU. Once the new CPU reaches the Primary operating state, the application can resume execution of the GET_TS_EVT_M function block.
The following implementation principles should therefore be applied:
- Determine whether the local M580 CPU is currently the Primary CPU.
- Execute
GET_TS_EVT_Monly when the Primary status is active. - Do not execute the function block on the Standby CPU.
- After a Redundant switchover, allow the new Primary CPU to resume the function block execution.
- Ensure that the function block input and output variables are managed consistently during the switchover.
Đã phát hành cho: Schneider Electric Việt Nam
Tìm hiểu thêm
Phạm vi:
Tìm hiểu thêm
Phạm vi:
Bạn cần trợ giúp?
Công cụ chọn sản phẩm
Nhanh chóng và dễ dàng tìm được sản phẩm và phụ kiện phù hợp cho các ứng dụng của bạn.
Nhận báo giá
Bắt đầu gửi yêu cầu bán hàng trực tuyến và chuyên gia sẽ liên hệ với bạn.
Nơi mua hàng?
Dễ dàng tìm nhà phân phối Schneider Electric gần bạn nhất.
Trung tâm Hỗ trợ
Tìm sự hỗ trợ cho mọi nhu cầu của bạn tại một nơi.