{}

Merkene våre

Impact-Company-Logo-English Black-01-177x54

Velkommen til nettstedet til Schneider Electric

Velkommen til nettstedet vårt.

Søk i ofte stilte spørsmål (FAQ)

How to configure C/K for Varlogic in parallel operation of 2 CTs + summing transformer?

If both CTs are the same, e.g. 200A/5A, and summing CT gives rated 5A output with ration 5A+5A/5A, then if 200A flow in each rung (means 400A is total current), then both CTs gives 5A secondary and summing transformer with ratio 5A+5A/5A gives 5A output. o CT ratio as Varlogic sees is 400A/5A

For better explanation see attached file. There is also example with c/K calculation. It is in French only , but easy to understand it. Case with 2CTs in parallel + summing CT is specifically in section 4.1, pages 9-10.

Schneider Electric Norway

Vedlegg

Guide for parallel operation.pdfGuide for parallel operation.pdf [391.3 KB]
Finn ut mer
Rekkevidde:
ReactiVar Standard Automatic Power Factor Capacitor BanksVarPlus Logic - LegacyPowerLogic PFC CapacitorsPowerLogic PFC Capacitor Banks IEC
Finn ut mer
Rekkevidde:
ReactiVar Standard Automatic Power Factor Capacitor BanksVarPlus Logic - LegacyPowerLogic PFC CapacitorsPowerLogic PFC Capacitor Banks IEC