Issue
There may not be room in the switchgear for another set of CT's so it is possible to use an existing set CT's. An example would be if there is a set of CT's for a power meter already installed in the gear.
Product Line
AccuSine PCS+
Resolution
Attached is an example wiring diagram showing how the existing metering CT's can be wired to the AccuSine from the power meter. These CT's need to be wired in series to the AccuSine from the power meter. It will not work correctly if wired in parallel.
There may not be room in the switchgear for another set of CT's so it is possible to use an existing set CT's. An example would be if there is a set of CT's for a power meter already installed in the gear.
Product Line
AccuSine PCS+
Resolution
Attached is an example wiring diagram showing how the existing metering CT's can be wired to the AccuSine from the power meter. These CT's need to be wired in series to the AccuSine from the power meter. It will not work correctly if wired in parallel.
Опубліковано для: Schneider Electric Україна
Потрібна допомога?
Інструмент вибору продукту
Швидко та легко знаходьте потрібні продукти й допоміжне обладнання для своїх завдань.
Розрахувати вартість
Ставте свої запитання щодо продажів онлайн, і з вами зв’яжеться фахівець
Де придбати?
Зручний пошук найближчого дистриб’ютора, магазина або спеціалізованого партнера Schneider Electric у вашому регіоні.
Довідковий центр
Знайдіть усі необхідні ресурси для підтримки в одному місці.