Issue:
OPA or OPM is being requested for the anchorage detail in the NetShelter structural calculations document.
Product line:
NetShelter SX
Environment:
All models, all serial numbers.
Cause:
OPA or OPM is required.
Resolution:
The OSHPD Preapproval of Anchorage (OPA) was discontinued effective March, 1 2013.
OPM replaced OPA.
Installation of NetShelter SX cabinets using the bracket kit AR7701A-S, and following the instructions in the attached document, will be OSHPD approved.
NOTE: The IBC Structural Calculations for Seismic Applications document on the APC website will be updated soon to show the new bracket AR7701A-S is also to be used for IBC High Seismic Area installation.
OPA or OPM is being requested for the anchorage detail in the NetShelter structural calculations document.
Product line:
NetShelter SX
Environment:
All models, all serial numbers.
Cause:
OPA or OPM is required.
Resolution:
The OSHPD Preapproval of Anchorage (OPA) was discontinued effective March, 1 2013.
OPM replaced OPA.
Installation of NetShelter SX cabinets using the bracket kit AR7701A-S, and following the instructions in the attached document, will be OSHPD approved.
NOTE: The IBC Structural Calculations for Seismic Applications document on the APC website will be updated soon to show the new bracket AR7701A-S is also to be used for IBC High Seismic Area installation.
เผยแพร่สำหรับ: ชไนเดอร์ อิเล็คทริค Thailand






ต้องการความช่วยเหลือใช่หรือไม่
โปรแกรมช่วยเลือกผลิตภัณฑ์
ค้นหาผลิตภัณฑ์และอุปกรณ์เสริมที่เหมาะสมกับการใช้งานของคุณได้อย่างรวดเร็วและง่ายดาย
ติดต่อฝ่ายขาย
ติดต่อสอบถามเกี่ยวกับการขายผ่านทางเว็บไซต์ และผู้เชี่ยวชาญจะติดต่อกลับ
สถานที่จัดจำหน่ายอยู่ที่ใด
ค้นหาตัวแทนจำหน่าย ชไนเดอร์ อิเล็คทริค ที่ใกล้ตัวคุณที่สุดได้อย่างง่ายดาย
ศูนย์ความช่วยเหลือ
ค้นหาแหล่งข้อมูลเพื่อสนับสนุนความต้องการทั้งหมดของคุณได้จากที่เดียว