Image of Effective turbine controls for cogeneration facilities

Effective turbine controls for cogeneration facilities

This paper focuses not on turbine replacement, but on the upgrade/ replacement of the integrated governor and excitation system controls. In many instances, a control system upgrade will extend the life of existing turbines, avoiding costly refurbishment

Date: 03 Oct 2016 | Type: White Paper
Languages: English | Version: 1.0
Document Reference: PAS_63680_CPM16067

Files

File Name
ID#267_998-19681874_GMA-US.pdf